For General Contractors
Post-construction cleaning in Arizona
Rough, final and touch-up cleans sequenced against your punch list, staffed to hold the turnover date rather than a fixed crew size.
- OSHA-trained crews
- Scales to the schedule
- Additional insured certificates
Request a free quote
Tell us about your facility. We respond the same business day.
- OSHA-Trained Crews
- Bonded & Insured
- BBB Accredited
- Green Cleaning Certified
- 100% Satisfaction Guarantee
- Self-Performing W-2 Crews
What's Included
Post-Construction Cleaning coverage
Rough Clean
Bulk debris and packaging cleared so trades can keep working.
Final Clean
Detailed clean of every surface, fixture and glass pane after trades finish.
Touch-Up Clean
The last pass immediately before owner walkthrough.
Exterior & Glass
Pressure washing plus rope-access and lift-assisted high-rise glass.
How It Works
From first call to first clean
- 01
Scope from drawings
We quote from plans and a site visit, phased by rough, final and touch-up rather than one lump number.
- 02
Mobilisation
Crews complete your site orientation, sign-in and PPE requirements before starting.
- 03
Phased execution
Each phase is scheduled against trade completion so we're never cleaning ahead of the work.
- 04
Walkthrough support
We stay available through owner walkthrough to clear punch-list items same day.
Our Method
How we deliver post-construction cleaning
Post-construction is not deep cleaning with a different name. The soil is different, the sequencing is driven by other trades rather than by us, and the deadline is a certificate of occupancy rather than a preference. The failure mode is almost always the same: a contractor books one clean, trades come back through, and the building has to be cleaned twice at the contractor's cost. We phase it so that does not happen.
Quote from drawings and a site visit
We price from plans plus a walk, phased as rough, final and touch-up rather than one lump number. Debris volume, finish complexity and glass elevation drive the number far more than floor area does, and high-rise glass and pressure washing are quoted separately because access dictates their cost.
Rough clean, so trades can keep working
Bulk debris, packaging, offcuts and protective coverings are cleared after framing and rough-in. This is a production task, not a detail task, and it is staffed and priced accordingly. Getting it done on time is what keeps the trades behind us moving.
Final clean, top down and dust first
Construction dust is fine enough to stay airborne for hours, so we work strictly top down and capture rather than redistribute: HEPA vacuums on ledges, frames, ductwork, light fixtures, cabinet interiors and window tracks before any wet work. Cleaning low to high on a final is why a building looks dusty again the next morning.
Adhesive, label and residue removal
Stickers, manufacturer labels, adhesive film, paint overspray, grout haze and concrete splatter come off with solvents and blades matched to the substrate. This is where new finishes get scratched, so technicians are trained on what tool touches which surface and anything uncertain gets escalated rather than experimented on.
Floors sealed and finished last
Hard floors are scrubbed, sealed and given their initial finish coats after the trades are clear, with cure time built into the schedule before handover. Putting finish down before the last trade walks through is a guaranteed second mobilization.
Touch-up through owner walkthrough
We stay available for the final pass immediately before walkthrough and clear punch-list items same day rather than scheduling a return trip. Certificates naming your entity as additional insured are issued before we mobilize, not after you chase them.
Built to published industry standards
Labor is workloaded on ISSA production rates, the quality system follows the CIMS management framework, green practice follows Green Seal GS-42, and chemical handling follows OSHA Hazard Communication with EPA-registered products held to label contact time.
- ISSA
- Green Seal
- OSHA
- EPA
Scope of Work
What a standard scope includes
Written per facility after a walkthrough. This is the baseline for post-construction cleaning, adjusted to your square footage, frequency and operating hours.
- Construction debris and packaging removal
- Sticker, label and adhesive removal
- Construction dust removal from all surfaces
- Interior and exterior window cleaning
- Fixture, cabinet and millwork detailing
- Hard-floor scrub, seal and initial finish
- Restroom and break area final clean
- Punch-list touch-up before handover
Questions
Post-Construction Cleaning: common questions
Other Services
You may also need
Commercial Janitorial
Day, evening and overnight programs for Arizona facilities, run by directly employed crews against a written scope, with quality documented on every visit.
Floor Care & Strip/Wax
Restoration and maintenance for VCT, concrete, tile and carpet, scheduled as defined line items so the cost and the downtime are known in advance.
Disinfection & Sanitizing
EPA-registered products applied to the surfaces that actually transmit, held for the contact time the label requires, and documented so you can evidence it.
Window & Glass Cleaning
Storefront to high-rise, including the hard-water etching and post-monsoon dust that Arizona glass collects and a standard wash does not remove.
Get a quote for your facility
Send us your square footage and service needs. We'll walk the building, put a written scope in front of you, and hold the price.
Free quotes · Same business-day response · No obligation
