JANI-WORKS Cleaning & Disinfecting

    For General Contractors

    Post-construction cleaning in Arizona

    Rough, final and touch-up cleans sequenced against your punch list, staffed to hold the turnover date rather than a fixed crew size.

    • OSHA-trained crews
    • Scales to the schedule
    • Additional insured certificates

    Request a free quote

    Tell us about your facility. We respond the same business day.

    • OSHA-Trained Crews
    • Bonded & Insured
    • BBB Accredited
    • Green Cleaning Certified
    • 100% Satisfaction Guarantee
    • Self-Performing W-2 Crews

    What's Included

    Post-Construction Cleaning coverage

    Rough Clean

    Bulk debris and packaging cleared so trades can keep working.

    Final Clean

    Detailed clean of every surface, fixture and glass pane after trades finish.

    Touch-Up Clean

    The last pass immediately before owner walkthrough.

    Exterior & Glass

    Pressure washing plus rope-access and lift-assisted high-rise glass.

    How It Works

    From first call to first clean

    1. 01

      Scope from drawings

      We quote from plans and a site visit, phased by rough, final and touch-up rather than one lump number.

    2. 02

      Mobilisation

      Crews complete your site orientation, sign-in and PPE requirements before starting.

    3. 03

      Phased execution

      Each phase is scheduled against trade completion so we're never cleaning ahead of the work.

    4. 04

      Walkthrough support

      We stay available through owner walkthrough to clear punch-list items same day.

    See the full quoting process

    Our Method

    How we deliver post-construction cleaning

    Post-construction is not deep cleaning with a different name. The soil is different, the sequencing is driven by other trades rather than by us, and the deadline is a certificate of occupancy rather than a preference. The failure mode is almost always the same: a contractor books one clean, trades come back through, and the building has to be cleaned twice at the contractor's cost. We phase it so that does not happen.

    1. Quote from drawings and a site visit

      We price from plans plus a walk, phased as rough, final and touch-up rather than one lump number. Debris volume, finish complexity and glass elevation drive the number far more than floor area does, and high-rise glass and pressure washing are quoted separately because access dictates their cost.

    2. Rough clean, so trades can keep working

      Bulk debris, packaging, offcuts and protective coverings are cleared after framing and rough-in. This is a production task, not a detail task, and it is staffed and priced accordingly. Getting it done on time is what keeps the trades behind us moving.

    3. Final clean, top down and dust first

      Construction dust is fine enough to stay airborne for hours, so we work strictly top down and capture rather than redistribute: HEPA vacuums on ledges, frames, ductwork, light fixtures, cabinet interiors and window tracks before any wet work. Cleaning low to high on a final is why a building looks dusty again the next morning.

    4. Adhesive, label and residue removal

      Stickers, manufacturer labels, adhesive film, paint overspray, grout haze and concrete splatter come off with solvents and blades matched to the substrate. This is where new finishes get scratched, so technicians are trained on what tool touches which surface and anything uncertain gets escalated rather than experimented on.

    5. Floors sealed and finished last

      Hard floors are scrubbed, sealed and given their initial finish coats after the trades are clear, with cure time built into the schedule before handover. Putting finish down before the last trade walks through is a guaranteed second mobilization.

    6. Touch-up through owner walkthrough

      We stay available for the final pass immediately before walkthrough and clear punch-list items same day rather than scheduling a return trip. Certificates naming your entity as additional insured are issued before we mobilize, not after you chase them.

    See the full operating methodology

    Built to published industry standards

    Labor is workloaded on ISSA production rates, the quality system follows the CIMS management framework, green practice follows Green Seal GS-42, and chemical handling follows OSHA Hazard Communication with EPA-registered products held to label contact time.

    • ISSA
    • Green Seal
    • OSHA
    • EPA
    How we work

    Scope of Work

    What a standard scope includes

    Written per facility after a walkthrough. This is the baseline for post-construction cleaning, adjusted to your square footage, frequency and operating hours.

    • Construction debris and packaging removal
    • Sticker, label and adhesive removal
    • Construction dust removal from all surfaces
    • Interior and exterior window cleaning
    • Fixture, cabinet and millwork detailing
    • Hard-floor scrub, seal and initial finish
    • Restroom and break area final clean
    • Punch-list touch-up before handover

    Questions

    Post-Construction Cleaning: common questions

    Get a quote for your facility

    Send us your square footage and service needs. We'll walk the building, put a written scope in front of you, and hold the price.

    Free quotes · Same business-day response · No obligation